At Runkle Consulting, Inc., we pride ourselves on taking on challenging and innovative projects. A contractor, Mike Hammersmith Construction, tasked us with an exciting endeavor: a structural modification of existing building by converting a warehouse into a state-of-the-art sound studio. The details of this project highlight our commitment to precision, creativity, and engineering excellence.

Project Overview

The owner of the sound studio, who wishes to remain anonymous to avoid impacting search engine results for his website, enlisted our expertise to transform a warehouse used in the filming of “Last Vegas” into a functional and sophisticated sound studio. This project is also featured in the acclaimed book, Below the Line by Meredith Jordan. While Meredith does not mention Runkle Consulting, Inc. in her book. However, the connection between our president, George Runkle, and Meredith is a fascinating one. They grew up in the same area and knew the same people but only met after the book was published.

The Challenge

The primary challenge of this project was the removal of several columns within the warehouse to create an open and unobstructed space suitable for a sound studio. This required us to devise a method to support the ceiling without compromising the structural integrity of the entire building.

Our Approach

  1. Engineering Precision: The project required meticulous planning and precision engineering. We developed a strategy to remove the columns and replace them with a beam strong enough to support the ceiling.
  2. Sequencing: The sequencing of the construction process was critical. We had to ensure that the contractor perfectly timed the removal of the columns and installed the new beam with perfect timing to prevent any structural failure.
  3. On-Site Supervision: To guarantee the safety and success of the project, our team was present on-site throughout the entire operation. This allowed us to monitor every step and make immediate adjustments as needed.

Outcome

The result was a seamless transformation of the warehouse into a spacious and functional sound studio. The project demonstrated our ability to handle complex structural challenges and deliver outstanding results with this structural modification of existing building. Our client’s satisfaction and the successful modification of the warehouse stand as a testament to our expertise and dedication.

Conclusion

At Runkle Consulting, Inc., we thrive on tackling unique and demanding projects. Converting a warehouse into a sound studio was a remarkable journey that showcased our engineering capabilities and commitment to excellence. We look forward to continuing to push the boundaries of what is possible in structural design and engineering.

For more information about our services or to discuss how we can assist with your next project, please contact us today.


Feel free to visit our website or follow us on social media for more updates and insights from the world of structural engineering and design.

Temporary support in place for removal of columns
Temporary bracing to allow removal of columns.
LIfting beams into place
Lifting the beams in place.
We put the beam in place and we are almost ready to remove temporary support.
The contractor enlarged the foundations to take the additional weight
The contractor placed additional columns to support the new beam.